Skip to main content

Services

Six disciplines, one accountable contract

From the first sketch to the handover dossier, every stage of your build is delivered by our own licensed architects, registered engineers and site crews — no subcontractor chain, no finger-pointing.

What we do

Everything your build needs, end to end

Each service can be commissioned on its own or bundled into a single turnkey contract — with one bill of quantities, one payment schedule and one team answering for the result.

Architectural Design

Plot-perfect drawings by licensed architects — 3D visualisation, society approvals and layouts that work the way you actually live.

  • Site study, zoning rules and concept layouts
  • 3D visualisation and revision rounds before construction
  • Approval drawing sets for DHA, LDA, CDA and society offices

Structural Engineering

PEC-registered structural design with Grade-60 steel specifications, seismic detailing and stamped drawing sets for DHA, LDA and BTAP.

  • Soil investigation and foundation design
  • Grade-60 steel schedules with seismic detailing
  • Stamped structural drawings and bar-bending schedules

Grey Structure Construction

Foundation to roof slab built to a fixed rate and a written specification — no substitutions, no hidden shortcuts.

  • Excavation, footings and raft with tested concrete mixes
  • RCC columns, beams and slabs with cube-test reports
  • Brickwork, plaster and roof waterproofing to specification

Turnkey Construction

One contract, one price, one accountable team from breaking ground to keys in your hand — including kitchens, woodwork and finishing.

  • Grey structure plus every finish in a single fixed price
  • Kitchens, wardrobes and custom woodwork included
  • MEP, tiles, paint, snagging and handover dossier

Interior & Exterior Finishing

Modular kitchens, false ceilings, elevations and façades delivered from approved 3D designs, not improvisation on site.

  • Modular kitchens, wardrobes and media walls
  • False ceilings, lighting plans and feature walls
  • Façades, elevations and stone or tile cladding

Project Management

Milestone-based contracts, weekly site reports and a dedicated engineer so you always know what is built, what is next and what it costs.

  • Milestone contracts with a published payment schedule
  • Weekly photo and progress reports from site
  • QC inspections, variation control and handover records

Our Process

How Siddique Son's Architect works

Four disciplined stages, milestone payments and a single point of contact from first call to handover.

01

Consultation & Design

We visit your plot, study the bylaws and prepare approved architectural drawings with photorealistic 3D views.

Transparent Pricing

Transparent construction rates

One published grey structure rate per city — and an honest turnkey range. Your final figure comes from an itemised BOQ, never from a guess.

Construction rates by city
CityGrey Structure (PKR/sq.ft.)Turnkey (PKR/sq.ft.)Relative cost
LahorePKR 3,000PKR 4,300
IslamabadPKR 3,250PKR 4,700
FaisalabadPKR 2,850PKR 4,000
MultanPKR 3,100PKR 4,200
SialkotPKR 3,150PKR 4,200

Rates are indicative for standard specifications and exclude premium imports, soil corrections and society development charges. Rates as of October 2026 — re-checked after every material-price review.

FAQ

Frequently asked questions

How much does grey structure construction cost in Pakistan right now?

Grey structure currently runs between PKR 2,850 and 3,250 per sq. ft. depending on the city, soil and specification. Turnkey construction typically lands between PKR 4,000 and 4,700 per sq. ft. Your exact figure comes from an itemised BOQ after a free site visit.

What is the difference between grey structure and turnkey construction?

Grey structure covers everything up to the roof slab — foundations, brickwork, slabs, plaster and rough MEP. Turnkey adds finishes, kitchens, woodwork, fittings and final MEP so the property is ready to move into under one contract and one price.

How long does a complete house construction project take?

A standard 10 marla turnkey home takes roughly 10 to 14 months from approved drawings to handover, weather and approval timelines included. Grey structure alone is usually 5 to 7 months. Your contract includes a milestone schedule with dates.

Do you handle society and authority approvals?

Yes. Architectural and structural drawings are prepared for DHA, LDA, BTAP and cantonment approvals, and we manage submissions, revision cycles and inspections until the permit is issued.

Can overseas Pakistanis build without visiting Pakistan?

Yes. Consultation happens on a video call in your time zone, designs are approved on WhatsApp, contracts are signed digitally, payments are tied to verified milestones, and you receive a site video every week until handover.

How do payments work during construction?

Payments are milestone-based — foundation, slab, brickwork, plaster, finishing — and each release is tied to verified progress with photo evidence. We never ask for money ahead of completed work.

Get Started

Ready to start your project?

Send your plot details and requirements — you will get a cost range and a call back within 24 hours.

Talk to our team