Skip to main content

Calculator

How much material will your project consume?

Enter your covered area — we will estimate the bricks, cement bags, sand, aggregates and steel required for the grey structure, including a wastage allowance.

Total covered area

2,500 sq. ft.

Bricks

—

pieces

Cement

—

bags × 50 kg

Sand

—

cubic feet (cft)

Stone Aggregates

—

cubic feet (cft)

Steel

—

kg

Indicative grey-structure quantities including your selected wastage allowance. Final figures come from an itemised BOQ after a free site visit.

Request exact quantities

How we calculate

Published consumption norms

The calculator multiplies your total covered area by these per-square-foot grey-structure norms, then adds the wastage allowance you selected. The figures are calibrated against typical residential builds across Punjab.

MaterialPer sq. ft. covered
Bricks23 pcs
Cement0.23 bags (50 kg)
Sand1 cft
Stone aggregates1 cft
Steel4.5 kg

Turnkey finishes are not included

These quantities cover the grey structure — foundations to roof slab. Tiles, paint, woodwork and fittings follow a different bill of quantities; our team prepares both in the same BOQ.

See what turnkey includes

Get Started

Ready to start your project?

Send your plot details and requirements — you will get a cost range and a call back within 24 hours.