Calculator
How much material will your project consume?
Enter your covered area — we will estimate the bricks, cement bags, sand, aggregates and steel required for the grey structure, including a wastage allowance.
Total covered area
2,500 sq. ft.
Bricks
—
pieces
Cement
—
bags × 50 kg
Sand
—
cubic feet (cft)
Stone Aggregates
—
cubic feet (cft)
Steel
—
kg
Indicative grey-structure quantities including your selected wastage allowance. Final figures come from an itemised BOQ after a free site visit.
Request exact quantitiesHow we calculate
Published consumption norms
The calculator multiplies your total covered area by these per-square-foot grey-structure norms, then adds the wastage allowance you selected. The figures are calibrated against typical residential builds across Punjab.
| Material | Per sq. ft. covered |
|---|---|
| Bricks | 23 pcs |
| Cement | 0.23 bags (50 kg) |
| Sand | 1 cft |
| Stone aggregates | 1 cft |
| Steel | 4.5 kg |
Turnkey finishes are not included
These quantities cover the grey structure — foundations to roof slab. Tiles, paint, woodwork and fittings follow a different bill of quantities; our team prepares both in the same BOQ.
See what turnkey includesGet Started
Ready to start your project?
Send your plot details and requirements — you will get a cost range and a call back within 24 hours.